sync: auto-sync from HOWARD-HOME at 2026-07-15 12:21:30

Author: Howard Enos
Machine: HOWARD-HOME
Timestamp: 2026-07-15 12:21:30
This commit is contained in:
2026-07-15 12:22:01 -07:00
parent 5aeabbcfb6
commit 0e244a610f
10 changed files with 197 additions and 65 deletions

View File

@@ -10,19 +10,26 @@
- Former Admin: admin@NETORGFT4257522.onmicrosoft.com (Sandra Fish — previous director, removed 2026-04-14: global admin revoked, sign-in blocked, P2 license removed)
- DirSync / Entra Connect: **Not configured** (all accounts cloud-only) — **PLANNED: Install Entra Connect for SSO**
- HIPAA BAA: **Covered by MCA** — Microsoft Customer Agreement automatically includes the HIPAA BAA for Business plan subscribers (confirmed 2026-05-14, no separate acceptance needed)
- MFA: **Not enabled** — Security Defaults not configured
- MFA: **Enabled for all staff** via Conditional Access (live; caregivers protected by on-network restriction + 8h sign-in frequency instead of MFA prompts). Earlier "not enabled" note was pre-CA-rollout.
## Licensing
## Licensing (updated 2026-07-15 — live Graph verification by Mike/GURU-5070)
| License Type | Total | Assigned | Available |
|---|---|---|---|
| Microsoft 365 Business Standard | 34 | 34 | 0 |
| Microsoft 365 Business Premium | 45 | 41 | 4 |
| Microsoft 365 Business Standard | **SUSPENDED** | 30 consumed | — |
| Microsoft Entra ID P2 | 1 | 0 | 1 (unassigned — was Sandra Fish, available for testing) |
| Microsoft Power Automate Free | 10000 | 2 | 9998 |
| Microsoft Stream Trial | 1000000 | 0 | 1000000 |
| Exchange Online Essentials | — | 4 | — |
**Note:** Business Standard is fully allocated (34/34, 0 available). Any new hires require purchasing additional licenses.
**Note (2026-07-15):** The Business Premium migration is largely done — 45 Premium owned,
41 assigned (the caregiver rollout). The old Business Standard subscription is **suspended**
with ~30 office staff still sitting on it; none of them hold Premium. Moving them is
**net-new spend** (~26 net-new paid seats ≈ $572/mo; best case ~17 net-new ≈ $374/mo after
converting 8 role/shared mailboxes — accounting@, hr@, frontdesk@, etc. — to free shared
mailboxes and removing former employee jodi.ramstack). The per-user table below predates
this and reflects the old Standard assignments.
### Planned expansion — caregiver rollout (not yet purchased)

View File

@@ -89,6 +89,7 @@
table.todo td.tgt{ font-family:var(--f-mono); font-size:8px; color:var(--accent-ink);
font-weight:500; white-space:nowrap; }
table.todo td.cost{ font-family:var(--f-mono); font-size:8px; color:var(--ink-2); white-space:nowrap; }
table.todo td.comp{ font-family:var(--f-mono); font-size:8px; color:var(--ink-3); min-width:46px; }
table.mach{ border-collapse:collapse; width:calc(100% - 29px); margin:3px 0 0 29px; }
table.mach th{ font-family:var(--f-mono); font-size:6.8px; font-weight:500;
@@ -135,18 +136,29 @@
<div class="eyebrow">Technology Plan · FY 20262027</div>
<h1>Cascades of Tucson Technology Plan</h1>
<p class="lede">A living action document: for each area of the facility's technology, what has
been done and what is planned, with an owner, cost, and target for every action. Prepared with
been done and what is planned, with an owner, cost, target, and completion date for every action. Prepared with
Az Computer Guru. Reviewed and updated at least annually.</p>
</div>
<div class="gov">
<div><span class="k">Plan owner</span><span class="v">Cascades of Tucson</span></div>
<div><span class="k">Plan owner</span><span class="v">Cascades of Tucson — Administrator (Ashley Jensen)</span></div>
<div><span class="k">Prepared with</span><span class="v">Az Computer Guru</span></div>
<div><span class="k">Plan period</span><span class="v">FY 20262027</span></div>
<div><span class="k">Adopted by / date</span><span class="v"><i>at adoption</i></span></div>
<div><span class="k">Next annual review</span><span class="v"><i>adoption + 12 months</i></span></div>
<div style="grid-column:1/-1"><span class="k">Standard reference</span><span class="v">CARF Technology and System Plan, Aging Services Standards Manual (Section 1, "CARF Plans") — <i>manual edition confirmed at adoption</i></span></div>
</div>
<div class="band-label">Basis of this plan</div>
<p class="lede" style="max-width:none">This plan is based on the needs of the people Cascades serves and the people who serve them.
<b>Persons served:</b> resident safety (Helpany fall/motion sensors with no camera and no microphone), reliable building-wide
WiFi for residents and families, and protection of resident health records. <b>Personnel:</b> dependable workstations, one
sign-on to the clinical record, and secure access that follows staff roles. <b>Other stakeholders:</b> families (connectivity
and privacy), regulators (HIPAA safeguards), and vendors (managed under Business Associate Agreements).</p>
<p class="lede" style="max-width:none">Technology priorities align with Cascades' strategic goals: resident safety first (safety sensors, proven power-outage
recovery), regulatory standing (HIPAA safeguards, CARF conformance, auditable records), and efficient operations (modern
workstations, single sign-on, and a sanctioned analytics path for leadership).</p>
<div class="band-label">The eight areas</div>
<section class="area">
@@ -159,11 +171,11 @@
</ul>
<span class="lbl lbl--todo">To do</span>
<table class="todo">
<tr><th style="width:52%">Action</th><th>Owner</th><th>Cost</th><th>Target</th></tr>
<tr><td>Install the purchased enterprise SSDs (scheduled window)</td><td class="own">ACG</td><td class="cost">purchased</td><td class="tgt">3060 days</td></tr>
<tr><td>Replace workstations marked for replacement (list below, 5 + spare)</td><td class="own">ACG</td><td class="cost">~$700950 ea</td><td class="tgt">6090 days</td></tr>
<tr><td>Scope and quote a server refresh project</td><td class="own">ACG + Cascades</td><td class="cost">formal quote</td><td class="tgt">90 days</td></tr>
<tr><td>Bring remaining switch ports up to full gigabit speed</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">90 days</td></tr>
<tr><th style="width:46%">Action</th><th>Owner</th><th>Cost</th><th>Target</th><th>Completed</th></tr>
<tr><td>Install the purchased enterprise SSDs (scheduled window)</td><td class="own">ACG</td><td class="cost">purchased</td><td class="tgt">3060 days</td><td class="comp"></td></tr>
<tr><td>Replace workstations marked for replacement (list below, 5 + spare)</td><td class="own">ACG</td><td class="cost">~$700950 ea</td><td class="tgt">6090 days</td><td class="comp"></td></tr>
<tr><td>Scope and quote a server refresh project</td><td class="own">ACG + Cascades</td><td class="cost">formal quote</td><td class="tgt">90 days</td><td class="comp"></td></tr>
<tr><td>Bring remaining switch ports up to full gigabit speed</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">90 days</td><td class="comp"></td></tr>
</table>
<span class="lbl lbl--todo">Workstations marked for replacement</span>
<table class="mach">
@@ -187,11 +199,11 @@
</ul>
<span class="lbl lbl--todo">To do</span>
<table class="todo">
<tr><th style="width:52%">Action</th><th>Owner</th><th>Cost</th><th>Target</th></tr>
<tr><td>Right-size Microsoft 365 licensing: move users off the legacy license; full Office licenses only where needed, lighter licenses for everyone else</td><td class="own">ACG</td><td class="cost">reduces monthly cost</td><td class="tgt">30 days</td></tr>
<tr><td>Complete staff domain migration + department drives</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">6090 days</td></tr>
<tr><td>Final Windows Pro upgrade (1 deferred device)</td><td class="own">ACG</td><td class="cost">~$99</td><td class="tgt">next window</td></tr>
<tr><td>Retire the per-PC Synology sync client as machines migrate</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">with migration</td></tr>
<tr><th style="width:46%">Action</th><th>Owner</th><th>Cost</th><th>Target</th><th>Completed</th></tr>
<tr><td>Move office staff off the suspended legacy Microsoft 365 license onto supported licenses; full Office only where needed, lighter licenses elsewhere</td><td class="own">ACG</td><td class="cost">new licensing, ~$375575/mo</td><td class="tgt">30 days</td><td class="comp"></td></tr>
<tr><td>Complete staff domain migration + department drives</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">6090 days</td><td class="comp"></td></tr>
<tr><td>Final Windows Pro upgrade (1 deferred device)</td><td class="own">ACG</td><td class="cost">~$99</td><td class="tgt">next window</td><td class="comp"></td></tr>
<tr><td>Retire the per-PC Synology sync client as machines migrate</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">with migration</td><td class="comp"></td></tr>
</table>
</section>
@@ -207,13 +219,13 @@
</ul>
<span class="lbl lbl--todo">To do</span>
<table class="todo">
<tr><th style="width:52%">Action</th><th>Owner</th><th>Cost</th><th>Target</th></tr>
<tr><td>Create emergency break-glass admin accounts with hardware security keys</td><td class="own">ACG</td><td class="cost">~$110 keys</td><td class="tgt">30 days</td></tr>
<tr><td>Enforce the caregiver device allow-list (final enforcement phase)</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">3060 days</td></tr>
<tr><td>Limit trusted-network sign-in to approved devices (next enforcement phase)</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">3060 days</td></tr>
<tr><td>Enable file-access audit logging with 90-day / 6-year retention</td><td class="own">ACG</td><td class="cost">~$50120/mo</td><td class="tgt">6090 days</td></tr>
<tr><td>Formalize a same-day offboarding checklist</td><td class="own">Cascades HR + ACG</td><td class="cost">none</td><td class="tgt">30 days, standing</td></tr>
<tr><td>Package the dated security risk assessment</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">60 days</td></tr>
<tr><th style="width:46%">Action</th><th>Owner</th><th>Cost</th><th>Target</th><th>Completed</th></tr>
<tr><td>Create emergency break-glass admin accounts with hardware security keys</td><td class="own">ACG</td><td class="cost">~$110 keys</td><td class="tgt">30 days</td><td class="comp"></td></tr>
<tr><td>Enforce the caregiver device allow-list (final enforcement phase)</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">3060 days</td><td class="comp"></td></tr>
<tr><td>Limit trusted-network sign-in to approved devices (next enforcement phase)</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">3060 days</td><td class="comp"></td></tr>
<tr><td>Enable file-access audit logging with 90-day / 6-year retention</td><td class="own">ACG</td><td class="cost">~$50120/mo</td><td class="tgt">6090 days</td><td class="comp"></td></tr>
<tr><td>Formalize a same-day offboarding checklist</td><td class="own">Cascades HR + ACG</td><td class="cost">none</td><td class="tgt">30 days, standing</td><td class="comp"></td></tr>
<tr><td>Package the dated security risk assessment</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">60 days</td><td class="comp"></td></tr>
</table>
</section>
@@ -226,11 +238,11 @@
</ul>
<span class="lbl lbl--todo">To do</span>
<table class="todo">
<tr><th style="width:52%">Action</th><th>Owner</th><th>Cost</th><th>Target</th></tr>
<tr><td>Complete the Business Associate Agreement inventory (every vendor touching PHI)</td><td class="own">Cascades + ACG</td><td class="cost">none</td><td class="tgt">60 days</td></tr>
<tr><td>Move ALIS fully to single sign-on (retire the separate native login)</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">60 days</td></tr>
<tr><td>Enable encryption on the resident-data file share</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">6090 days</td></tr>
<tr><td>Maintain a one-page contract / renewal / BAA tracker</td><td class="own">Cascades + ACG</td><td class="cost">none</td><td class="tgt">90 days, standing</td></tr>
<tr><th style="width:46%">Action</th><th>Owner</th><th>Cost</th><th>Target</th><th>Completed</th></tr>
<tr><td>Complete the Business Associate Agreement inventory (every vendor touching PHI)</td><td class="own">Cascades + ACG</td><td class="cost">none</td><td class="tgt">60 days</td><td class="comp"></td></tr>
<tr><td>Move ALIS fully to single sign-on (retire the separate native login)</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">60 days</td><td class="comp"></td></tr>
<tr><td>Enable encryption on the resident-data file share</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">6090 days</td><td class="comp"></td></tr>
<tr><td>Maintain a one-page contract / renewal / BAA tracker</td><td class="own">Cascades + ACG</td><td class="cost">none</td><td class="tgt">90 days, standing</td><td class="comp"></td></tr>
</table>
</section>
@@ -243,10 +255,10 @@
</ul>
<span class="lbl lbl--todo">To do</span>
<table class="todo">
<tr><th style="width:52%">Action</th><th>Owner</th><th>Cost</th><th>Target</th></tr>
<tr><td>Repurpose the Synology NAS as the onsite backup for the server (with off-site backup continuing)</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">6090 days</td></tr>
<tr><td>Run and document a test restore</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">90 days</td></tr>
<tr><td>Confirm and document the retention policy</td><td class="own">ACG</td><td class="cost">none</td><td class="tgt">60 days</td></tr>
<tr><th style="width:46%">Action</th><th>Owner</th><th>Cost</th><th>Target</th><th>Completed</th></tr>
<tr><td>Repurpose the Synology NAS as the onsite backup for the server (with off-site backup continuing)</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">6090 days</td><td class="comp"></td></tr>
<tr><td>Run and document a test restore</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">90 days</td><td class="comp"></td></tr>
<tr><td>Confirm and document the retention policy</td><td class="own">ACG</td><td class="cost">none</td><td class="tgt">60 days</td><td class="comp"></td></tr>
</table>
</section>
@@ -259,9 +271,9 @@
</ul>
<span class="lbl lbl--todo">To do</span>
<table class="todo">
<tr><th style="width:52%">Action</th><th>Owner</th><th>Cost</th><th>Target</th></tr>
<tr><td>Complete the Helpany rollout; move sensors to their own protected network segment</td><td class="own">Helpany + ACG</td><td class="cost">vendor + labor</td><td class="tgt">90 days</td></tr>
<tr><td>Inventory all resident-facing technology (nurse-call / pendants, assistive listening, resident WiFi for telehealth) into this plan</td><td class="own">Cascades + ACG</td><td class="cost">none</td><td class="tgt">next review</td></tr>
<tr><th style="width:46%">Action</th><th>Owner</th><th>Cost</th><th>Target</th><th>Completed</th></tr>
<tr><td>Complete the Helpany rollout; move sensors to their own protected network segment</td><td class="own">Helpany + ACG</td><td class="cost">vendor + labor</td><td class="tgt">90 days</td><td class="comp"></td></tr>
<tr><td>Inventory all resident-facing technology (nurse-call / pendants, assistive listening, resident WiFi for telehealth) into this plan</td><td class="own">Cascades + ACG</td><td class="cost">none</td><td class="tgt">next review</td><td class="comp"></td></tr>
</table>
</section>
@@ -274,10 +286,10 @@
</ul>
<span class="lbl lbl--todo">To do</span>
<table class="todo">
<tr><th style="width:52%">Action</th><th>Owner</th><th>Cost</th><th>Target</th></tr>
<tr><td>Write the formal disaster-recovery / business-continuity plan with recovery-time targets</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">90 days</td></tr>
<tr><td>Documented restore test (with area 5)</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">90 days</td></tr>
<tr><td>Server redundancy (pairs with the server refresh project)</td><td class="own">ACG + Cascades</td><td class="cost">project quote</td><td class="tgt">FY project</td></tr>
<tr><th style="width:46%">Action</th><th>Owner</th><th>Cost</th><th>Target</th><th>Completed</th></tr>
<tr><td>Write the formal disaster-recovery / business-continuity plan with recovery-time targets</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">90 days</td><td class="comp"></td></tr>
<tr><td>Documented restore test (with area 5)</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">90 days</td><td class="comp"></td></tr>
<tr><td>Server redundancy (pairs with the server refresh project)</td><td class="own">ACG + Cascades</td><td class="cost">project quote</td><td class="tgt">FY project</td><td class="comp"></td></tr>
</table>
</section>
@@ -285,15 +297,15 @@
<div class="area__head"><span class="area__no">08</span><h2 class="area__title">Virus &amp; threat protection</h2></div>
<span class="lbl lbl--done">Done</span>
<ul class="done">
<li>Managed endpoint detection &amp; response (EDR) on every managed device (about 35), <b>including the main server</b> (completed July 2026).</li>
<li>Managed endpoint detection &amp; response (EDR) on every managed, enrolled device (35), <b>including the main server</b> (verified live July 2026).</li>
<li>Microsoft Defender and Exchange Online Protection on email; managed monitoring and patching on all devices.</li>
<li>Legacy agents from the previous IT provider removed from the server.</li>
</ul>
<span class="lbl lbl--todo">To do</span>
<table class="todo">
<tr><th style="width:52%">Action</th><th>Owner</th><th>Cost</th><th>Target</th></tr>
<tr><td>Remove remaining legacy agents: DESKTOP-TRCIEJA (retires with its replacement) and DESKTOP-F94M8UT (powered off; completes on power-on); finish console cleanup</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">3060 days</td></tr>
<tr><td>Standing coverage audit: every device reporting into managed security</td><td class="own">ACG</td><td class="cost">none</td><td class="tgt">quarterly</td></tr>
<tr><th style="width:46%">Action</th><th>Owner</th><th>Cost</th><th>Target</th><th>Completed</th></tr>
<tr><td>Remove remaining legacy agents: DESKTOP-TRCIEJA (retires with its replacement); finish console cleanup</td><td class="own">ACG</td><td class="cost">labor</td><td class="tgt">3060 days</td><td class="comp"></td></tr>
<tr><td>Standing coverage audit: every device reporting into managed security</td><td class="own">ACG</td><td class="cost">none</td><td class="tgt">quarterly</td><td class="comp"></td></tr>
</table>
</section>

View File

@@ -5,12 +5,28 @@
| Governance | |
|---|---|
| Plan owner | Cascades of Tucson |
| Plan owner | Cascades of Tucson — Administrator (Ashley Jensen) |
| Prepared with | Az Computer Guru (Mike Swanson, Howard Enos) |
| Standard reference | CARF Technology and System Plan, Aging Services Standards Manual (Section 1, "CARF Plans") — *[manual edition confirmed at adoption]* |
| Plan period | FY 20262027 |
| Adopted by / date | *[at adoption]* |
| Next annual review | *[adoption + 12 months]* |
## Basis of this plan
This plan is based on the needs of the people Cascades serves and the people who serve
them. **Persons served:** resident safety (Helpany fall/motion sensors with no camera and
no microphone), reliable building-wide WiFi for residents and families, and protection of
resident health records. **Personnel:** dependable workstations, one sign-on to the
clinical record, and secure access that follows staff roles. **Other stakeholders:**
families (connectivity and privacy), regulators (HIPAA safeguards), and vendors (managed
under Business Associate Agreements).
Technology priorities align with Cascades' strategic goals: resident safety first (safety
sensors, proven power-outage recovery), regulatory standing (HIPAA safeguards, CARF
conformance, auditable records), and efficient operations (modern workstations, single
sign-on, and a sanctioned analytics path for leadership).
---
## 1. Hardware
@@ -22,8 +38,8 @@
- Windows Pro upgrades completed on nearly all workstations for domain readiness.
**To do**
| Action | Owner | Cost | Target |
|---|---|---|---|
| Action | Owner | Cost | Target | Completed |
|---|---|---|---|---|
| Install the purchased enterprise SSDs (scheduled window) | ACG | already purchased | 3060 days |
| Replace workstations marked for replacement (list below, 5 + spare) | ACG | ~$700950 ea | 6090 days |
| Scope and quote a server refresh project | ACG + Cascades | formal quote | 90 days |
@@ -48,9 +64,9 @@
department structure and drive mapping built.
**To do**
| Action | Owner | Cost | Target |
|---|---|---|---|
| Right-size Microsoft 365 licensing: move users off the legacy license; full Office licenses only where needed, lighter licenses for everyone else | ACG | reduces monthly cost | 30 days |
| Action | Owner | Cost | Target | Completed |
|---|---|---|---|---|
| Move office staff off the suspended legacy Microsoft 365 license onto supported licenses; full Office only where needed, lighter licenses elsewhere | ACG | new licensing, ~$375575/mo depending on mix | 30 days |
| Complete staff domain migration + department drives | ACG | labor | 6090 days |
| Final Windows Pro upgrade (1 deferred device) | ACG | ~$99 | next window |
| Retire the per-PC Synology sync client as machines migrate | ACG | labor | with migration |
@@ -66,8 +82,8 @@
- Email authentication (SPF, DKIM, DMARC) enforced.
**To do**
| Action | Owner | Cost | Target |
|---|---|---|---|
| Action | Owner | Cost | Target | Completed |
|---|---|---|---|---|
| Create emergency break-glass admin accounts with hardware security keys | ACG | ~$110 keys | 30 days |
| Enforce the caregiver device allow-list (final enforcement phase) | ACG | labor | 3060 days, after break-glass |
| Limit trusted-network sign-in to approved devices (next enforcement phase) | ACG | labor | 3060 days |
@@ -82,8 +98,8 @@
- Shared care devices auto-lock; resident and voice traffic isolated on the network.
**To do**
| Action | Owner | Cost | Target |
|---|---|---|---|
| Action | Owner | Cost | Target | Completed |
|---|---|---|---|---|
| Complete the Business Associate Agreement inventory (every vendor touching PHI) | Cascades + ACG | none | 60 days |
| Move ALIS fully to single sign-on (retire the separate native login) | ACG | labor | 60 days |
| Enable encryption on the resident-data file share | ACG | labor | 6090 days |
@@ -97,8 +113,8 @@
- Firewall and network configuration backed up.
**To do**
| Action | Owner | Cost | Target |
|---|---|---|---|
| Action | Owner | Cost | Target | Completed |
|---|---|---|---|---|
| Repurpose the Synology NAS as the onsite backup for the server (with off-site backup continuing) | ACG | labor | 6090 days |
| Run and document a test restore | ACG | labor | 90 days |
| Confirm and document the retention policy | ACG | none | 60 days |
@@ -111,8 +127,8 @@
- Building-wide WiFi supporting resident and family connectivity.
**To do**
| Action | Owner | Cost | Target |
|---|---|---|---|
| Action | Owner | Cost | Target | Completed |
|---|---|---|---|---|
| Complete the Helpany rollout; move sensors to their own protected network segment | Helpany + ACG | vendor-billed + labor | 90 days |
| Inventory all resident-facing technology (nurse-call/pendants, assistive listening, resident WiFi for telehealth) into this plan | Cascades + ACG | none | next review |
@@ -124,8 +140,8 @@
- UPS battery backup installed on core equipment and all network switches; off-site backup running.
**To do**
| Action | Owner | Cost | Target |
|---|---|---|---|
| Action | Owner | Cost | Target | Completed |
|---|---|---|---|---|
| Write the formal disaster-recovery / business-continuity plan with recovery-time targets | ACG | labor | 90 days |
| Documented restore test (with area 5) | ACG | labor | 90 days |
| Server redundancy (pairs with the server refresh project) | ACG + Cascades | project quote | FY project |
@@ -133,16 +149,16 @@
## 8. Virus & threat protection
**Done**
- Managed endpoint detection & response (EDR) on every managed device (about 35),
**including the main server** (completed July 2026).
- Managed endpoint detection & response (EDR) on every managed, enrolled device (35),
**including the main server** (verified live July 2026).
- Microsoft Defender and Exchange Online Protection on email; managed monitoring and
patching on all devices.
- Legacy agents from the previous IT provider removed from the server.
**To do**
| Action | Owner | Cost | Target |
|---|---|---|---|
| Remove remaining legacy agents: DESKTOP-TRCIEJA (retires with its replacement) and DESKTOP-F94M8UT (powered off; completes on power-on); finish console cleanup | ACG | labor | 3060 days |
| Action | Owner | Cost | Target | Completed |
|---|---|---|---|---|
| Remove remaining legacy agents: DESKTOP-TRCIEJA (retires with its replacement); finish console cleanup | ACG | labor | 3060 days |
| Standing coverage audit: every device reporting into managed security | ACG | none | quarterly |
---