diff --git a/IMPLEMENTATION_SUMMARY.md b/IMPLEMENTATION_SUMMARY.md index 064ca4d..b5284be 100644 --- a/IMPLEMENTATION_SUMMARY.md +++ b/IMPLEMENTATION_SUMMARY.md @@ -1,5 +1,7 @@ # Phase 5: Dashboard UI Implementation - Complete +> **[WARNING] STATUS — 2026-05-25 re-audit: the UI is built, but the safe-rollout backend it presents is NOT live.** `update_rollouts` / `update_health_metrics` are written but never read to gate promotion (gururmm `docs/FEATURE_ROADMAP.md` BUG-004); crash detection was dead until the BUG-002 fix (branch `fix/audit-2-remediation`, unmerged). Promotion is currently 100% manual. Decision 2026-05-25 (Mike): keep the feature inert and labeled; automated health-gated promotion deferred to a roadmap Phase-2 item that must be properly re-spec'd. + ## Summary Successfully implemented the Updates page for GuruRMM dashboard, providing comprehensive rollout management and health monitoring capabilities. diff --git a/PHASE_5_COMPLETE.md b/PHASE_5_COMPLETE.md index f8e20b6..04719af 100644 --- a/PHASE_5_COMPLETE.md +++ b/PHASE_5_COMPLETE.md @@ -1,5 +1,7 @@ # Phase 5: Dashboard UI - IMPLEMENTATION COMPLETE +> **[WARNING] STATUS — 2026-05-25 re-audit: "complete" refers to the UI only; the safe-rollout gating it surfaces is NOT live.** `update_rollouts` / `update_health_metrics` are written but never read to gate promotion (gururmm `docs/FEATURE_ROADMAP.md` BUG-004); crash detection was dead until the BUG-002 fix (branch `fix/audit-2-remediation`, unmerged). Promotion is currently 100% manual. The dashboard may render rollout/health data that influences nothing yet. Decision 2026-05-25 (Mike): keep the backend feature inert and labeled; automated gating deferred to a roadmap Phase-2 item requiring a full re-spec. + ## Overview Phase 5 of the Safe Agent Rollout System is now complete. The Updates page provides a production-ready interface for managing agent version rollouts with real-time health monitoring and safety controls. diff --git a/PHASE_6_TEST_PLAN.md b/PHASE_6_TEST_PLAN.md index 022f5d6..c05c2dc 100644 --- a/PHASE_6_TEST_PLAN.md +++ b/PHASE_6_TEST_PLAN.md @@ -1,4 +1,7 @@ # Phase 6: End-to-End Testing Plan + +> **[WARNING] STATUS — 2026-05-25 re-audit: the safe-rollout gating this plan tests is NOT live.** `update_rollouts` and `update_health_metrics` are written but never read to gate promotion (see gururmm `docs/FEATURE_ROADMAP.md` BUG-004); crash detection was dead code until the BUG-002 fix (branch `fix/audit-2-remediation`, unmerged). Promotion is currently 100% manual via channel columns. Treat this document as **Phase-2 aspirational** — passing/failing it does not reflect a working safe-rollout feature. Decision 2026-05-25 (Mike): keep the feature inert and labeled; automation deferred to a roadmap Phase-2 item that must be properly re-spec'd. + ## Safe Agent Rollout System **Date:** 2026-05-25 diff --git a/verify-rollout-system.sh b/verify-rollout-system.sh index 1a88f21..abe9872 100755 --- a/verify-rollout-system.sh +++ b/verify-rollout-system.sh @@ -1,6 +1,16 @@ #!/usr/bin/env bash # Verification script for Safe Agent Rollout System # Run on gururmm-build (172.16.3.30) to verify Phase 1-5 implementation +# +# ===================================================================== +# [WARNING] STATUS - 2026-05-25 re-audit: the safe-rollout gating this script +# verifies is NOT live. update_rollouts / update_health_metrics are written but +# never read to gate promotion (gururmm docs/FEATURE_ROADMAP.md BUG-004); crash +# detection was dead code until the BUG-002 fix (branch fix/audit-2-remediation, +# unmerged). Promotion is currently 100% manual. This verifies INERT scaffolding +# - Phase-2 aspirational until the gating is re-spec'd and wired. Decision +# 2026-05-25 (Mike): keep the feature inert and labeled. +# ===================================================================== set -e