wiki: compile lonestar-electrical (full) + reconstruct Sophos removal log

Reconstructs the 2026-05-28/29 Sophos removal work on LS-1/LS-2 that was
never saved to a session log (survived only in a gitignored temp draft +
coord message). Adds the kernel-driver tamper-protection removal pattern
and WinRE completion steps; refreshes live Syncro data (17.0 prepaid hrs).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-06-01 18:01:07 -07:00
parent 0b70d52ab8
commit 963980a0bb
3 changed files with 104 additions and 12 deletions

View File

@@ -1,7 +1,7 @@
# Wiki Index
Last updated: 2026-05-29
Compiled by: Mikes-MacBook-Air.local/claude-main
Last updated: 2026-06-01
Compiled by: GURU-5070/claude-main
This wiki is LLM-maintained. Do not edit articles manually — run `/wiki-compile` to update.
Run `/wiki-lint` to check for stale entries and broken backlinks.
@@ -41,7 +41,7 @@ Run `/wiki-lint` to check for stale entries and broken backlinks.
| [Western Tire](clients/western-tire.md) | Tire retail (jackfurriers.com brand); Mike Furrier owner (Syncro ID 391491); email migrated from websvr to IX 2026-04-22; 30 mailboxes; SSL cert expires 2026-05-30 | 2026-05-24 |
| [Kittle (general contractor)](clients/kittle.md) | General contractor Tucson AZ; Syncro 32460233; HPE MicroServer Gen11 WS2025 EVAL at 10.0.0.5; no backups, no firewall; DKIM/DMARC missing; 3 plaintext creds in Syncro notes; GuruRMM onboarding 2026-05-08 | 2026-05-24 |
| [Khalsa (two-site)](clients/khalsa.md) | Two-site client (Camden + River); onboarding not completed; domain khalsa.local, DC TROUT at 10.11.12.254; Mac domain-join runbook documented; template docs otherwise empty | 2026-05-24 |
| [Lone Star Electrical Systems](clients/lonestar-electrical.md) | Electrical contractor Tucson AZ; Syncro 33809612, prepaid block 17.25 hrs; Google Workspace (not M365); ManageEngine MDM (Zoho); 2026-03 dual-EMM self-enrollment trap resolved; field/mobile-first | 2026-05-26 |
| [Lone Star Electrical Systems](clients/lonestar-electrical.md) | Electrical contractor Tucson AZ; Syncro 33809612, prepaid block 17.0 hrs; Google Workspace (not M365); ManageEngine MDM (Zoho); 2026-03 dual-EMM self-enrollment trap resolved; LS-1/LS-2 inherited-Sophos kernel-driver removal in progress; field/mobile-first | 2026-06-01 |
| [Anaise](clients/anaise.md) | Single workstation client; contact David (anaisedavid.office@gmail.com); DESKTOP-O8GF4SD; creds in vault at clients/anaise/desktop-o8gf4sd.sops.yaml; onboarding incomplete; M365 enrollment unconfirmed | 2026-05-24 |
| [ACG Website (azcomputerguru.com)](clients/azcomputerguru.com.md) | Public website redesign (Astro); score 33/40; placeholder testimonials + no-backend form are pre-launch blockers; OKLCH token design system; see internal-infrastructure.md for ACG servers | 2026-05-24 |
| [Quantum WMS](clients/quantumwms.md) | WMS company; quantumwms.com tenant (ddf3d2c9); GoDaddy decoupling + M365 migration; 2x Business Premium + Exchange Online Plan 1; deadline 2026-06-03; Tenant Admin consented 2026-05-26 | 2026-05-26 |