sync: auto-sync from HOWARD-HOME at 2026-05-06 15:10:59
Author: Howard Enos Machine: HOWARD-HOME Timestamp: 2026-05-06 15:10:59
This commit is contained in:
@@ -91,3 +91,17 @@ Two FYIs from today:
|
||||
|
||||
- Remediation tool: Security Investigator app (`bfbc12a4-...`), Graph + EXO read scopes only. Token cached at `/tmp/remediation-tool/207fa277-e9d8-4eb7-ada1-1064d2221498/`.
|
||||
- No write actions taken on any tenant.
|
||||
|
||||
## 4. Cascades 4-UPS install billing -- ticket #32101 (later same day)
|
||||
|
||||
Closed out the long-running "Estimate - UPS/battery back ups" ticket #32101. Hardware (4x CyberPower 500v/300w UPS @ $399.99 + 1x APC UPS 1500 @ $889.99) had already been invoiced on 2026-04-03 (invoice #67341). Howard had performed the four mechanical-room installs (1st through 4th floor, each protecting that floor's UniFi switch; 1st floor also protects the phone switches); installed the larger Memory Care unit several days earlier separately.
|
||||
|
||||
Billed onsite labor only -- 4 installs x 0.5 hr = 2.0 hrs at product `26118` Labor - Onsite Business ($175/hr) -- against Cascades' prepay block. No emergency multiplier (regular onsite work).
|
||||
|
||||
- Comment posted (customer-visible)
|
||||
- Timer 39053175, charged -> line item 42328604 (1.0 line, 2.0 qty, $350 total)
|
||||
- Invoice #67569 created at $0 (fully covered by prepay)
|
||||
- Cascades prepay: 48.5 -> **46.5 hrs** (2.0 debited)
|
||||
- Ticket status: Waiting for Parts -> Invoiced
|
||||
|
||||
Memory Care install was excluded from this billing per Howard's direction (confirmed: 4 installs, not 5).
|
||||
|
||||
Reference in New Issue
Block a user