Commit Graph

3 Commits

Author SHA1 Message Date
67182e0684 docs(rollout): reconcile Phase 5/6 docs — safe-rollout gating is inert (BUG-004)
Per the 2026-05-25 re-audit + Mike's decision (option b): the safe-rollout
promotion gating these docs describe/test is NOT live (update_rollouts /
update_health_metrics written-but-never-read; crash detection dead until the
unmerged BUG-002 fix). Added a [WARNING] STATUS banner to the test plan, verify
script, and the two 'complete' summaries so they aren't trusted as validating a
working feature. Automation is a roadmap Phase-2 item requiring a full re-spec.
2026-05-25 15:04:44 -07:00
9bee713d9c fix: Correct server name from Saturn to gururmm-build
Saturn is decommissioned. The GuruRMM build server at 172.16.3.30
is correctly named 'gururmm-build'.

Also fixed wiki standards template that incorrectly listed Neptune
as 172.16.3.30. Neptune is actually the Exchange server at Dataforth
(172.16.3.11), not the GuruRMM build server.

Updated files:
- PHASE_6_TEST_PLAN.md (all Saturn references)
- verify-rollout-system.sh (comments)
- session-logs/2026-05-25-session.md (all Saturn references)
- .claude/specs/wiki-layer/standards.md (Neptune example)

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-05-25 14:24:02 -07:00
c99018ac42 test: Add Phase 6 testing plan and verification script
Created comprehensive test plan covering:
- Test 1: Beta-first build workflow
- Test 2: Health monitoring and crash detection
- Test 3: Promotion workflow with health gates
- Test 4: Rollback and force-downgrade
- Test 5: Dashboard UI testing
- Test 6: End-to-end integration testing

Added verification script for Saturn:
- Checks all 5 phases implementation
- Verifies database tables, source files, routes
- Validates build artifacts and service status
- Provides clear pass/fail status

Usage: Run verify-rollout-system.sh on Saturn before Phase 6 testing.

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-05-25 13:59:28 -07:00