Thread 1 (AD-side prep on CS-SERVER) completed:
- howard.enos password reset to memorable value (PHS will sync to M365 once staging exits)
- proxyAddresses=SMTP:howard.enos@cascadestucson.com added (G1 convention)
Thread 2 (CA reconciliation) blocked: ComputerGuru - Tenant Admin SP
(appId 709e6eed-...) has zero directory role assignments in Cascades.
Graph CA endpoints 403 despite Policy.ReadWrite.ConditionalAccess on token.
Decision pending: Path A (Graph-side role assignment via existing
RoleManagement.ReadWrite.Directory) vs Path B (portal click as admin@).
Target role: Conditional Access Administrator
(b1be1c3e-b65d-4f19-8427-f6fa0d97feb9) on SP objectId
a5fa89a9-b735-4e10-b664-f042e265d137.
Follow-up: extend onboard-tenant.sh to assign this role at onboard time
(parallels 16f95e8 Exchange Admin fix for Exchange Operator SP).
Pilot target slipped 2026-04-27 to 2026-04-28. ALIS App Store still
inaccessible — install-side of ALIS SSO still deferred regardless.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Comprehensive log of the Entra setup work spanning 4/24 evening through 4/25.
Includes a Resume Point at the top so the next session can pick up cleanly.
Highlights:
- Entra Connect Sync installed in staging mode on CS-SERVER, scope OU=Caregivers
- Pilot AD account howard.enos@cascadestucson.com created
- Master plan v2 with explicit drift log (FIDO2/YubiKey injection caught)
- HIPAA retention remediation: 7 mailboxes restored from soft-delete (4/22 deletes
violated 164.316(b)(2)); termination procedures policy + IR-2026-04-24-001 documented
- admin@cascadestucson.com re-promoted to Global Admin (Sandra Fish cleanup had
stripped role); residual profile data cleaned
- Existing Cascades CA architecture discovered (Named Location 72.211.21.217 + all-users
MFA policy from 2026-02-11) — adjusts plan, no duplicate policies needed
- Syncro ticket #32214 'Entra setup' with hidden private rollup (~40-45 billable hrs)
Released session lock; resume point flagged in PROJECT_STATE.md.
Establishes inter-session coordination for 29 projects/clients:
- Full lock/component format for active projects (dataforth-dos,
radio-show, cascades-tucson, valleywide, instrumental-music-center,
lens-auto-brokerage, msp-audit-scripts)
- Light format for complete/stalled/planning (msp-pricing, pavon,
wrightstown-*, gururmm-agent, community-forum, glaztech, etc.)
- Onboarding stubs for recently added clients
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>