Optimize the harness (not projects) for accuracy/completeness with context pressure as a first-class constraint; token efficiency secondary. Authored as a Claude+Grok+ Gemini review (see review-3way.md): P0 reliability footguns (submodule-safe sync, serialized/staged wiki synthesis, syncro SSOT, warn-only guard), P1 context diet (one-line registry descriptions, CLAUDE CORE/EXTENDED, thin save/sync), P2 delegation re-tune, P3 knowledge tiering. Adds harness VERSION marker + OOB recovery as rollout safety. Python port split to a separate future spec. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
5.8 KiB
5.8 KiB
ClaudeTools Harness Optimization — 3-Way Review Record
Independent reviews on 2026-06-08: Claude (firsthand session friction), Grok (xAI),
Gemini (Google). The analysis converged on the same P0/P1/P2/P3 priorities; the spec
draft was then put back to Grok and Gemini for a review pass. This file records each
model's input, the consensus, the dissent + how it was reconciled, and the resulting
revisions applied to shape.md/plan.md.
Consensus (all three, analysis phase)
- Two core weaknesses: distributed-write safety (
git add -A+ submodule + concurrent wiki recompiles) and context economics (repeated injection of the skill/command registry, CLAUDE.md, big command bodies). - P0 = reliability footguns (submodule-safe sync, decouple/serialize wiki, SSOT for command-vs-standard, guards). P1 = context diet (one-line descriptions, CLAUDE CORE/EXTENDED, thin save/sync). P2 = re-tune over-delegation. P3 = tier the knowledge layers. Accuracy first; never compress safety/billing/vault rules for tokens.
Grok — spec review highlights
- GAPS: no fleet rollout/escape-hatch under heterogeneity; no harness VERSION marker; coord-lock failure modes unanalyzed; incomplete "where is text injected" inventory; discoverability after the diet; no fleet-level success criteria.
- SEQUENCING: Task 3 "confirm with Mike" must be a prerequisite, not inside the edit task. Task 2 — build the gated/serialized path and prove it under concurrent load BEFORE excising the inline recompile. Task 1+4 touch the same staging path -> same branch. Task 9 is a behavioral-contract change under heterogeneity.
- HIGHEST RISK: Task 4 (pre-commit guard) can fail-closed and brick every machine's
/save. De-risk: standalone script, WARN-ONLY for 7-14 days,SKIP_HARNESS_GUARD=1bypass (logged+broadcast), test matrix, wire to fatal only after a clean warn period. - CUT/SIMPLIFY: defer Task 8 (shard syncro/rmm) past P1; consolidate per-task verifies into one rollout checklist; drop ongoing token telemetry (one-off before/after is enough); drop the arbitrary 40-60 memory number.
- ADD: Task 0.5 —
.claude/harness/VERSION+ CORE reference, bumped on every fleet-visible behavioral change, so sessions can detect partial rollout.
Gemini — spec review highlights
- GAPS: coord-lock lifecycle/orphan-eviction undefined; the lazy-load mechanism for sharded command files is undefined (models will glob-load them anyway).
- SEQUENCING: put the guard (Task 4) in EARLY so you don't commit the very footguns you are fixing while developing Tasks 1-2.
- HIGHEST RISK: Task 2 "wiki merge-not-rewrite" via automation -> progressive structural
corruption / duplicated headers / hallucinated artifacts. De-risk: a STAGING pattern
— background job writes proposed updates to
.claude/wiki_staging/+ notifies; an operator or focused validation agent reviews + applies the diff. - CUT/SIMPLIFY: cut Task 11 (Python port) from this spec -> a separate future spec; fix
Bash determinism first. Simplify Task 10 — NO monolithic
session-logs/INDEX.md(recreates the bloat); use date-folder structure (session-logs/YYYY-MM/) + scoped grep instead. - ADD: an out-of-band recovery script (
force-pull-raw.sh) distributed BEFORE P0, so a node can rescue itself if a P0 change brickssync.sh/save.sh(the update vector).
Dissent + reconciliation
- Pre-commit guard timing — Grok: wire late, warn-only (it can brick saves). Gemini: put it in first (catch footguns during dev). RESOLVED: build it EARLY as a standalone script in WARN-ONLY mode (present during Task 1-2 dev, non-fatal), with a logged bypass; promote to fatal only after a clean warn period. Satisfies both.
- Highest-risk task — Grok: Task 4 (guard fail-closed). Gemini: Task 2 (wiki auto-merge corruption). RESOLVED: both are top risks; address both — guard is warn-only, and wiki uses the staging-review pattern (no blind auto-merge).
- Session-log INDEX — Claude proposed a monolithic INDEX; Gemini: that recreates
bloat. RESOLVED: drop the monolithic index; reorganize logs into
YYYY-MM/folders and recall via scoped grep. - Python port — Grok accepted it as a P4 stretch; Gemini: cut to a separate spec. RESOLVED: this spec lands the deterministic Bash fixes (jq JSON, phoenix-date helper, skills-deploy parity) only; a full Python port is a SEPARATE future spec.
Revisions applied to the spec (see plan.md)
- NEW Task 0.5: harness
VERSIONmarker (+ CORE reference) for partial-rollout detection. - NEW Task 0.6: OOB
force-pull-raw.shrecovery script, distributed before any P0 change. - Task 3 split: Task 3a (confirm the billing SSOT truth with Mike) is a hard prerequisite.
- Task 2 rewritten: staging pattern (
.claude/wiki_staging/+ review/apply) + prove under concurrent load + coord-lock lifecycle (orphan eviction, coord-down fallback) BEFORE removing the inline recompile. - Task 4 rewritten: standalone guard, WARN-ONLY first, bypass flag, test matrix; built early, co-developed with Task 1 on one branch, promoted to fatal only after a clean warn window.
- Task 7 constraint: keep any LLM/narrative step OUT of the critical mechanical save/sync path (no new failure domain in the hot loop).
- Task 8 (shard syncro/rmm) demoted to P2/deferred; needs a real lazy-load gate to be worth it.
- Task 9 gated on fleet harness VERSION (behavioral-contract change).
- Task 10: date-folder logs + scoped grep (no monolithic index); drop the 40-60 number; keep graduate + memory-dream.
- Task 11 (Python port) moved OUT of this spec to a future one; deterministic Bash fixes stay (jq, phoenix-date, skills-deploy).
- Verification consolidated into one P0/P1 rollout checklist with fleet-level success criteria (e.g., 2 consecutive days, zero conflict markers / submodule accidents).
- Added a "where is text injected" inventory pass as a prerequisite to the diet (P1).