Files
claudetools/projects/wrightstown-solar/PROJECT_STATE.md
Mike Swanson 492fbbf4c9 chore: add PROJECT_STATE.md to all active projects and clients
Establishes inter-session coordination for 29 projects/clients:
- Full lock/component format for active projects (dataforth-dos,
  radio-show, cascades-tucson, valleywide, instrumental-music-center,
  lens-auto-brokerage, msp-audit-scripts)
- Light format for complete/stalled/planning (msp-pricing, pavon,
  wrightstown-*, gururmm-agent, community-forum, glaztech, etc.)
- Onboarding stubs for recently added clients

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-19 18:53:34 -07:00

891 B

Wrightstown Solar — Project State

Last updated: 2026-04-20

Status: PLANNING Last Activity: 2026-02-09

DIY 48V LiFePO4 battery storage system (5-20 kWh) with Victron integration for the Wrightstown property. Components: EVE C40 cells, JK BMS, Victron MultiPlus II inverter/charger.

What Was Done

  • System design: 48V LiFePO4, EVE C40 cells, JK BMS, Victron MultiPlus II
  • Capacity range defined: 5-20 kWh depending on cell count
  • Victron integration planned
  • No hardware procured yet

If Resuming

  • Begin with hardware procurement (EVE C40 cells, JK BMS, Victron MultiPlus II)
  • Cell arrival: capacity test each cell individually before assembly
  • BMS configuration: program JK BMS for 48V LiFePO4 pack parameters
  • Victron setup: MultiPlus II commissioning, VE.Configure/VictronConnect
  • Check projects/wrightstown-solar/docs/ and session-logs/ for any notes