Re-baseline against actual git/deploy state: secure-session-core Tasks 1-7 are
committed and DEPLOYED; the 3 audit CRITICALs are closed and live in prod
(verified: deployed checkout abc55ab descends from the CRITICAL#1 fix + Task 7;
guruconnect.service running on :3002). The prior "Sprint 0: bypasses are live"
banner was wrong (stale 2026-05-29 audit narrative) and is removed. Remaining
to exit Phase 1 = secure-session-core Task 8 (e2e verification + security
re-audit) + Code-Review sign-off on Tasks 3-5. Schema note corrected
(connect_agent_keys + tenancy already exist via migration 004).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>