wiki: compile instrumental-music-center (update) — refresh prepaid hours (10.0), fold 2026-07-08 log source, bump last_compiled

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-07-10 11:20:28 -07:00
parent ecc0c8cd82
commit ebeb0ec1f6
2 changed files with 4 additions and 3 deletions

View File

@@ -2,7 +2,7 @@
type: client
name: instrumental-music-center
display_name: Instrumental Music Center
last_compiled: 2026-07-07
last_compiled: 2026-07-10
compiled_by: HOWARD-HOME/claude-main
sources:
- projects/gps-rmm-audit/session-logs/2026-07/2026-07-07-howard-gps-master-status-wikis-onsite-kit.md
@@ -29,6 +29,7 @@ sources:
- clients/instrumental-music-center/session-logs/2026-05-05-howard-aim-connection-broken-investigation.md
- clients/instrumental-music-center/session-logs/2026-05-06-howard-imc1-aim-instance-correction.md
- clients/instrumental-music-center/decisions/2026-05-07-mike-memory-allocation-approval.md
- clients/instrumental-music-center/session-logs/2026-07/2026-07-08-howard-imc-edr-rollout-sql-caps.md
backlinks:
- projects/gururmm
---
@@ -43,7 +44,7 @@ Music retail and instrument repair shop running AIMsi point-of-sale software on-
- **Contract type:** Prepaid hour block
- **Billing rate:** $175/hr all labor
- **Hours remaining:** 12.5 hrs as of 2026-04-28 (after debiting 1.5 hrs for Syncro #32218). Always live-check before billing.
- **Hours remaining:** 10.0 hrs as of 2026-07-10 (live Syncro). Always live-check before billing. (0 open Syncro tickets as of 2026-07-10.)
- **Syncro customer ID:** 7088508
- **Key contacts:**
- **Leslie Stirm** — primary contact; leslie@imc-az.com; Syncro contact_id 731730

View File

@@ -22,7 +22,7 @@ Run `/wiki-lint` to check for stale entries and broken backlinks.
| [Cascades of Tucson](clients/cascades-tucson.md) | Prepaid block $175/hr, **37.5 hrs remaining** (live 2026-07-10); senior living; active domain migration + HIPAA caregiver-lockdown project (GPOs deployed; Entra Hybrid Join + CA allow-list + ALIS SSO model proven); single DC (CS-SERVER) on aging R610 -- RAID **live-verified HEALTHY 2026-06-24** (the 6/15 "degraded" self-recovered; both mirrors Ok, 1:0:4 = global hot spare; consumer 320GB drives + lost-PSU-redundancy are planned follow-ups, NOT an emergency); cloud backup verified running; **Planned power outage 2026-06-23** clean self-shutdown executed + verified (bring-up ~09:00, John onsite); **Voice VLAN 30 migration COMPLETE 2026-06-19** (~38 devices: 29 Poly + 8 AudioCodes + desktop; awaiting Vertical to set Poly 5GHz-only); **UniFi RF optimized 2026-06-19** (77 U7-Pro APs/~587 clients: 2.4GHz power->Medium on 47 radios + 5GHz clean-DFS 40MHz channel plan -> 5GHz retry halved; 6GHz blocked by WPA3 on PPSK SSID); Syncro 0 open tickets (live EOD 2026-06-25), device-readiness audit done (5 PCs on Win Home need Home->Pro before join); **Alma Montt offboarded 2026-06-25** (Tenant Admin SP left holding a standing PAA role -- removal pending Mike); **CARF Technology & System Plan** deliverable in progress for Ashley Jensen; **endpoint security migration started 2026-06-25** (Datto EDR/AV replacing Bitdefender; 34 agents enrolled); **CS-SERVER: all Datto software removed 2026-06-26**, and the CS-SERVER "SMB error 67" proved to be an RMM-test artifact -- server is healthy, Karen share access verified interactively; **caregiver phone login LIVE 2026-07-01: roster reconciled to 35 (8 offboarded incl. Lassey dup, 4 new hires), two CA blockers fixed (MFA-exclude bug + compliance-block disabled), interim posture = desktops+phones on-network only; ALIS Email=UPN match + 3 new-hire ALIS records pending**; **CSC ENT->VLAN 20 migration (live 2026-07-01): 22 machines on VLAN 20 (only CS-SERVER + ~6 stragglers left on old LAN); printer shares lag at 4/15 repointed; P&P GPO still pilot-scoped**; `PSO-Caregivers` never-expire FGPP created 2026-07-02 (stops the 42-day cohort re-break); Shelby "Company Web Docs" share built 2026-07-02; Chris Knight granted FullAccess+SendAs on `accounting@` 2026-07-09; remaining-work plan: docs/REMAINING-WORK-PLAN.md | 2026-07-10 |
| [Dataforth Corporation](clients/dataforth.md) | Prepaid block ~$2,099/mo, **30.0 hrs remaining** (live 2026-07-04, 0 open tickets); signal-conditioning manufacturer; 64 DOS test stations; **new 2026-07-04: undocumented MYDATA TPSys SMT line controller (`myserver`, Fedora Core 3, VLAN2) discovered — root recovered via LILO single-user + vaulted; RMM agent ruled out (legacy glibc/kernel/no-systemd)**; test-data-chain audit 2026-07-01 (NWTOC v5.0 spec-copy gap = Syncro #32489); PBX inbound-SIP DNAT emergency fixed 2026-06-23; DFORTH-Ship 0x116 BSOD (aging G1 USDT); 2025 ransomware recovery + incomplete file restore; 2026-03 phishing + MFA; test-datasheet pipeline (Hoffman API + testdatadb on AD2); mail stack INKY->Mailprotector->EXO; shares-ACL project (all open to staff; Phase 2 strawman 2026-06-22); GuruRMM fleet ~45; Bitdefender phase-off | 2026-07-04 |
| [Desert RV Center](clients/desert-rv-center.md) | Break-fix + $213.35/mo recurring; RV dealership, Huachuca City AZ; 6 managed devices; DESERTRV.local domain (LAN 10.0.0.0/24); remote users RDP into on-site VMs over **ZeroTier** ("Desert RV" net 172.29.0.0/16); **2026-07-08: restored Alicia's RDP to DRV-BECKY** (stopped ZeroTierOneService = RDP 0x204; started + auto-restart; BECKY + DESKTOP-LBO396F enrolled in GuruRMM); DRV-BECKY firewall locked to RDP-only (no silent RMM push); BECKY slowness pending; 0 open tickets | 2026-07-08 |
| [Instrumental Music Center](clients/instrumental-music-center.md) | Prepaid block $175/hr; music retail/repair; AIMsi POS on IMC1\SQLEXPRESS (SQL 2019 Std, misleading name); phantom DC (ServerIMC) slow logons; **two locations split into GuruRMM Main + MOO sites 2026-07-07** (Main 14 agents / MOO 3: BigMom, GHG12G3, IMC-LUIS); full fleet enrolled | 2026-07-07 |
| [Instrumental Music Center](clients/instrumental-music-center.md) | Prepaid block $175/hr; music retail/repair; AIMsi POS on IMC1\SQLEXPRESS (SQL 2019 Std, misleading name); phantom DC (ServerIMC) slow logons; **two locations split into GuruRMM Main + MOO sites 2026-07-07** (Main 14 agents / MOO 3: BigMom, GHG12G3, IMC-LUIS); full fleet enrolled; AV = Datto EDR (not Bitdefender); IMC1 SQL max-memory caps applied 2026-07-07 | 2026-07-10 |
| [Jimmy Company](clients/jimmy.md) | Break-fix, $150/hr; single aging workstation BLASTER2 (Win10 22H2 EOL, i5-3470/3.8GB — replace); backups the recurring theme (QuickBooks data); onboarded to GuruRMM 2026-06-19 (RDP NLA + Kaseya removal + cleanup); MSP360 local backup drive full, 90-day retention set, space reclaim pending in console (cloud B2 healthy) | 2026-06-19 |
| [Valley Wide Plastering](clients/valleywide.md) | Prepaid block, 15.5 hrs remaining; plastering/stucco contractor; HP DL360 Gen10 + XenServer; VWP-FILES (G:) on Hyper-V — SMB1 enabled for the legacy XP Orders VM (V-XP); VB6 app modernization project; RDWeb brute-force incident; 11 Yealink phones pending | 2026-06-23 |
| [ACG Internal Infrastructure](clients/internal-infrastructure.md) | ACG's own hosting infra — Neptune Exchange (cert expires 2026-05-31, DkimSigner disabled), IX server, Cloudflare tunnel workaround, ACG M365 tenant gaps | 2026-05-24 |