Files
claudetools/clients/cascades-tucson/session-logs/2026-07/2026-07-17-howard-roadmap-finish-line-refresh.md
Howard Enos 22c54f7307 sync: auto-sync from HOWARD-HOME at 2026-07-17 10:24:46
Author: Howard Enos
Machine: HOWARD-HOME
Timestamp: 2026-07-17 10:24:46
2026-07-17 10:25:54 -07:00

118 lines
6.6 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Cascades of Tucson — Roadmap additions + finish-line refresh
## User
- **User:** Howard Enos (howard)
- **Machine:** Howard-Home
- **Role:** tech
## Session Summary
Continued from the 7/15 technology-plan-final session (see that log's Update sections for
the live verification sweep and jodi.ramstack decommission). This session extended and then
fully refreshed the Cascades execution roadmap (`docs/REMAINING-WORK-PLAN.md`).
First, per Howard's strategic direction, two new workstreams were added: **WS8 — M365
collaboration migration (SharePoint / Teams) — HIPAA lockdown** (dept shares on CS-SERVER +
Synology move to SharePoint libraries with role-based permissions from the AD dept groups;
Teams/OneDrive; audit logging, retention, DLP, sensitivity labels, external sharing off;
covered by existing Business Premium licensing; sequenced after the domain-migration tail),
and **WS9 — ALIS online payment system** (Medtelligent vendor conversation, business-office
coordination with Jeff Bristol, BAA tracker tie-in, KPI dashboard tie-in). A matching row
was added to the CARF tech plan Area 2 (SharePoint/Teams move) and the plan PDF re-rendered.
An 18-question Medtelligent scoping doc was drafted at
`docs/proposals/alis-online-payments-scoping-2026-07-15.md`.
Second, WS3 gained **step 3b**: nurse-station desktops NURSESTATION-PC + ASSISTNURSE-PC
(explicitly NOT the medtech laptops) get phone-parity shared login — any caregiver signs in
with their own `cascades\` username, gets ALIS via SSO and the same standardized desktop
shortcuts as the phones, delivered per-machine/all-users via the `CSC - Caregiver Workstation`
GPO. The canonical shortcut list must be captured from a phone home screen before building.
Third, on Howard's directive ("update the plan/roadmap … getting them finished"), the whole
REMAINING-WORK-PLAN got a **FINISH-LINE PASS**: a refreshed header block folding in the 7/15
live-verification results, jodi decommission, CARF plan finalization, Synology-sync correction,
and 21.5-hr block; per-workstream reconciliation (WS3 CA posture dates, WS4 relicensing math,
WS5 backup/image-staleness gate + pfSense ACB, WS6 live port/switch counts, WS9 drafted
status); and the sequence re-cut as a 10-step close-out order ending with a ticket-verify
pass with Howard.
## Key Decisions
- Verification discrepancies were folded into the internal ROADMAP but deliberately NOT into
the client-facing tech plan (Howard: "leave the rest alone and do not add").
- Nurse-station scope limited to the two desktops; medtech laptops explicitly excluded.
- WS8 sequenced AFTER the domain-migration tail — don't build SharePoint permissions on the
pre-migration flat-share model; Synology backup-only flip follows the SharePoint move.
- WS9 marked parallelizable (vendor-driven); scoping questions drafted but NOT sent — Howard
declined an email-ready version for now.
- Relicensing recalculated: 29 suspended-Standard users remain vs only 4 free SPB seats —
seat-mix decision (full vs lighter licenses, ~$375575/mo per CARF plan) required before
any license moves.
- Image/system-state backup (~10 days stale on 7/15) made an explicit GATE before the SSD swap.
- Tech plan PDF footer still shows stale 37.5 hrs (live 21.5) — left as-is per Howard
("dont send this as a PDF").
## Problems Encountered
- 3b was initially stamped "ADDED 2026-07-16" (date confusion mid-session); corrected to
2026-07-15 during the refresh pass.
- (Carried from 7/15 log: `UID` readonly in Git-Bash, jodi mailbox already deprovisioned by
the suspended sub, rebase/push race with Mike's MacBook sync — all resolved there.)
## Configuration Changes
- `clients/cascades-tucson/docs/REMAINING-WORK-PLAN.md` — WS8 + WS9 added; WS3 step 3b added;
FINISH-LINE refresh header; WS3/WS4/WS5/WS6/WS9 reconciled to live 7/15 state; sequence
re-cut to 10 steps.
- `clients/cascades-tucson/docs/proposals/cascades-technology-plan-2026-07-15.md` + `.html` +
`.pdf` — Area 2 row added (SharePoint/Teams move); PDF re-rendered 436,003 bytes / 4 pages.
- `clients/cascades-tucson/docs/proposals/alis-online-payments-scoping-2026-07-15.md` — NEW:
18 Medtelligent scoping questions in 5 groups + internal notes.
## Credentials & Secrets
- None new this session.
## Infrastructure & Servers
- Cascades M365 tenant `207fa277-e9d8-4eb7-ada1-1064d2221498`; SPB 45 enabled / 41 consumed;
suspended Business Standard 29 consumed (post-jodi).
- CA policies: off-network block `e35614e1` (enabled 2026-04-29; trusted IPs 72.211.21.217/32,
184.191.143.62/32), sign-in frequency `7d491c7a`, allow-list `1b7fd025` (report-only,
test-scoped), compliance-block `ede985e2` DISABLED (do not re-enable).
- ALIS: cascadestucson.alisonline.com, communityId 622, SSO appId
`d5108493-cba8-4f08-90b6-1bb0bc09eb2a` (secret to 2028-05-06).
- UniFi live 7/15: 11 switches, 77 APs, voice VLAN 37 devices, 34 ports @100Mb + 5 AP uplinks
sub-gig. Controller 172.16.3.29:11443 site `va6iba3v`.
- MSP360: daily file backup current; image/system-state ~10 days stale (gate for SSD swap).
- pfSense AutoConfigBackup not enabled.
## Commands & Outputs
- Roadmap edits via Edit tool only this session; no external commands of note.
## Pending / Incomplete Tasks
1. **Juan Andrade offboarding — was due 2026-07-16 afternoon** (coord todo `80716a98`) —
VERIFY it happened; if not, do it now.
2. Break-glass accounts + FIDO2 + strip stranded PAA role (blocks the allow-list flip).
3. Caregiver lockdown go-live (WS3 18 incl. 3b; capture phone shortcut list onsite).
4. Relicense 29 suspended-Standard users (seat-mix decision first).
5. Image backup repair/confirm -> SSD swap window.
6. Domain-join tail (~10 machines) + dept drives + printer GPO.
7. Network tail (CSC ENT island, gig sweep) + audit-retention build.
8. WS8 SharePoint/Teams scoping (after WS1/2 tail).
9. WS9: send scoping questions to Medtelligent (drafted, not sent), cc Jeff Bristol.
10. Ticket-verify pass with Howard (#32194/#32230/#32254/#32319/#32342/#32370).
- Tech plan: "we will come back to the tech plan" (Howard); PDF footer hours stale by choice.
## Reference Information
- Roadmap: `clients/cascades-tucson/docs/REMAINING-WORK-PLAN.md`
- Tech plan: `clients/cascades-tucson/docs/proposals/cascades-technology-plan-2026-07-15.{md,html,pdf}`
- ALIS scoping: `clients/cascades-tucson/docs/proposals/alis-online-payments-scoping-2026-07-15.md`
- Prior log (verification + jodi decommission evidence):
`clients/cascades-tucson/session-logs/2026-07/2026-07-15-howard-technology-plan-final.md`
- Wiki commit from 7/15 recompile: `7e15257`; coord todo Juan Andrade: `80716a98`
- Syncro customer 20149445; prepaid block 21.5 hrs (live 7/15)