- Added EXE copy from Ate\ProdSW to C:\ATE in NWTOC.BAT - Added /Y overwrite flag to all COPY commands - Removed cyclic DATA folder copies from NWTOC - Session log for 2026-03-16 DF DOS troubleshooting Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
53 lines
2.6 KiB
Markdown
53 lines
2.6 KiB
Markdown
# Session Log: 2026-03-16
|
|
|
|
## Summary
|
|
Investigated and fixed test station software update issue reported by Kevin at Dataforth. Station TS-8R was not getting 7BMAIN4.EXE updated after running UPDATE and rebooting.
|
|
|
|
## Root Cause Analysis
|
|
1. `T:\UPDATE.BAT` is a DEPLOY wrapper (initial station setup), not a software updater
|
|
2. NWTOC.BAT (Network-to-Computer) runs on boot to pull updates, but had two issues:
|
|
- **Missing EXE copy**: NWTOC copied `*DATA` subfolder contents but never copied EXEs from `T:\Ate\ProdSW\` to `C:\ATE\` where they actually live on DOS machines
|
|
- **No overwrite flag**: COPY commands lacked `/Y`, so existing files would prompt (hang on unattended boot)
|
|
3. Development had staged 7BMAIN4.EXE correctly at `Ate\ProdSW\` on AD2, but NWTOC never pulled it
|
|
|
|
## Changes Made
|
|
|
|
### NWTOC.BAT v4.0 -> v5.0
|
|
- Added `COPY /Y T:\Ate\ProdSW\*.EXE C:\ATE` (new step 2/3) to pull test executables
|
|
- Added `/Y` flag to ALL COPY commands for silent overwrite
|
|
- Removed all `*DATA` subfolder copy operations (5BDATA, 7BDATA, 8BDATA, DSCDATA, HVDATA, PWRDATA, RMSDATA, SCTDATA) -- these contain test parameter DAT files that are generated locally on stations and uploaded via CTONW; copying them back down would create cyclic overwrites
|
|
- Removed MD commands for DATA subdirectories (no longer needed)
|
|
- Renumbered steps from 4 to 3
|
|
|
|
### Deployment
|
|
- Deployed NWTOC.BAT v5.0 to AD2 `C:\Shares\test\COMMON\ProdSW\`
|
|
- Verified CR-LF line endings (DOS compatible)
|
|
- AD2-to-NAS sync will propagate within 15 minutes
|
|
|
|
## Infrastructure Checks
|
|
|
|
### AD2 Ate\ProdSW\ Contents
|
|
- 7BMAIN4.EXE: 283,456 bytes, dated 03/09/2026 (staged by development)
|
|
- 7BDATA subfolder: only DAT files (7BMAIN.DAT, TE1039DT.DAT)
|
|
- All 8 DATA subfolders contain only .DAT files (test parameters, sort tables)
|
|
|
|
### NAS Test Data Transfers (today)
|
|
- 6 stations transferred 73 files (all 7BLOG .SHT format):
|
|
- TS-27 (28), TS-11R (15), TS-3L (11), TS-11L (9), TS-10L (5), TS-10R (5)
|
|
- No TS-8R activity (consistent with Kevin's issue)
|
|
|
|
### TestDataDB (SQLite on AD2)
|
|
- Location: C:\Shares\testdatadb\database\testdata.db (~2.8 GB, ~6.1M records)
|
|
- Import ran today at 18:23, ingested 515 records (Mar 10-13 test dates)
|
|
- No test data from Mar 14-16 (weekend, expected)
|
|
- Backup task running daily at 2:00 AM (successful)
|
|
- NAS sync last ran at 18:45
|
|
|
|
## Pending Actions
|
|
- Kevin to run DEPLOY on TS-8R tomorrow morning (deploys new NWTOC v5.0)
|
|
- After deploy + reboot, NWTOC should pull 7BMAIN4.EXE to C:\ATE
|
|
- `T:\UPDATE.BAT` (NAS root DEPLOY wrapper) flagged for deletion (not yet removed)
|
|
|
|
## Files Changed
|
|
- `projects/dataforth-dos/batch-files/NWTOC.BAT` - v4.0 -> v5.0
|